Customer Introduction
Need to adapt to the rated power of individual cabinets at each stage and reserve room for improvement; Lithium battery fire protection devices are required for optional installation; Need to adapt to scenarios with low floor load-bearing capacity and difficulty in reinforcement;
Construction plan
Equipment coverage: High voltage direct current DPS (4kw, 6kw, 8kw); One line of mains power+one line of DPS protection;
According to the deployment of the rack and the development of the business, place orders, install equipment, debug and open services as needed.
Value of the plan
Increase the number of deployed cabinets by 35%;
Equipped with lithium battery fire protection device components (optional) to enhance the safety guarantee capability of lithium batteries;
All 21 cities in Guangdong Telecom have adopted the DPS scheme