It is necessary to fully utilize the area of the computer room, increase the number of operational cabinets, and improve operational efficiency; Need to adapt to the rated power of individual cabinets at each stage and reserve room for improvement; MEC deep edge data center: needs to adapt to scenarios with low floor load-bearing capacity and difficult reinforcement;
Construction plan
Equipment coverage: AC DPS (4kVA, 6kVA, 10kVA); High voltage direct current DPS (4kw, 6kw, 10kw); One line of mains power+one line of DPS protection;
According to the deployment of the rack and the development of the business, place orders, install equipment, debug and open services as needed.
Value of the plan
The requirements for load-bearing indicators have been significantly reduced, saving the cost of load-bearing renovation and avoiding renovation risks;
Quickly deploy and accelerate project implementation progress.