The first floor of Shijiazhuang Telecom office building is used for DC transformation. The project adopts the construction scheme of MindSec distributed power supply (DPS) + micro module data center:
It saves the load-bearing transformation cost of the floor, saves the construction period of the project, and significantly improves the efficiency;
More than 500 sets DPS have been deployed;
To improve the space utilization rate, the original planned power distribution room and battery room are used to place equipment cabinets, 25% more than the original ones.